EnoughToGet CalculatorsGuides

Concrete & masonry

How many 20 kg bags of concrete make a cubic metre?

By the EnoughToGet teamUpdated 2026-11-186 min readSources and assumptions

To determine how many 20 kg bags of concrete make a cubic metre, you must check the specific product data sheet for your chosen brand, as the yield typically ranges between 91 and 110 bags per cubic metre.

Try itConcrete slab: enter your own sizes
m
Type metres, for example 3.5.
m
The shorter side.
mm
100 mm is a common starting point for paths and patios. Driveways and sheds need a design for the load; check with your council or an engineer.
Yield per bag is about the same mix in every size, so the bag count changes but the volume does not. Check the yield on your bag.
%
Covers spills and uneven ground. You can change it.
Mesh is for slabs designed to carry loads. Ask for the design if you are unsure.
You need
24 bags
or 0.4 m³ ready-mix

Shopping list

ItemBuyNote
Concrete mix, 20 kg bags24 bags0.00909 m³ per 20 kg bag (110 × 20 kg bags per m³, scaled by weight)
Crushed rock base (50 mm compacted, if used)0.24 t0.10 m³ compacted
  • Bag yields differ between brands (Boral lists 108 bags of 20 kg per m³, Cement Australia 110). Check the yield on your own bag.
How this was worked out
  1. Area: length × width
    2 × 1 = 2 m²
  2. Volume: area × thickness ÷ 1000
    2.00 × 100 ÷ 1000 = 0.2 m³
  3. With waste: volume × (1 + waste)
    0.200 × 1.05 = 0.21 m³
  4. Bags (20 kg): volume with waste ÷ yield per bag, rounded up
    0.210 ÷ 0.00909 = 23.1 bags
  5. Ready-mix: volume with waste, rounded up to the order step
    0.210 → steps of 0.2 m³ = 0.4 m³
  6. Base: area × base depth ÷ 1000 × compacted density
    2.00 × 50 ÷ 1000 × 2.4 = 0.24 t

Understanding Bag Yield Variations

When planning a small project like a garden path or a shed base, you need to know how many bags of concrete are required to fill a specific volume. Different brands provide different counts for a cubic metre. For instance, the Boral Concrete Mix product data sheet states that 108 x 20 kg bags equate to one cubic metre of mixed concrete. In contrast, the Cement Australia Concrete Mix product data sheet (PDS CM rev 3) specifies that 110 x 20 kg bags are required per cubic metre. These variations occur because different manufacturers use different ratios of aggregate, sand, and cement within their pre-mixed bags. Because the density and composition of the dry mix vary, the amount of finished wet concrete produced from a 20 kg bag is not universal. Always refer to the specific product data sheet provided by the manufacturer to ensure your calculations are accurate for the specific brand you purchase.

Reading the Product Label Correctly

Not all concrete bags are created equal, and you must distinguish between different types of products when calculating your requirements. For example, the Bunnings Easy Mix Post Mix Concrete technical data sheet lists a yield of 0.01 m3 per 20 kg bag, which means 100 bags are required to make 1.0 m3. These are different products from the concrete mix figures provided by Boral or Cement Australia. When using the calculator on this site, the slab calculator uses the concrete mix figure rather than the Post Mix figure. If you are unsure which product you are buying, check your product label or supplier. The label will typically state the yield in cubic metres or the number of bags required to reach a cubic metre. Identifying whether the product is a standard concrete mix or a post mix is the first step in ensuring you order the correct amount of material for your project.

Converting Cubic Metres to Bags

Once you have determined the volume of your project in cubic metres, you convert that figure into the number of bags required. This involves multiplying your total volume by the number of bags per cubic metre specified by the manufacturer. If your calculation results in a decimal, you should always round up to the nearest whole bag to ensure you do not run short during the pour. For example, if your volume requires 11.55 bags, you must purchase 12 bags. It is also helpful to know the yield for larger bags if you prefer them. The Bunnings Easy Mix Post Mix Concrete technical data sheet notes that 1 x 30 kg bag equals 0.0151 m3, meaning 67 bags of that weight are needed for one cubic metre. By knowing these conversion factors, you can accurately estimate your needs based on the specific bag size and brand available at your local outlet.

Quick reference table

The calculator on this site helps simplify the process by providing specific bag counts for common small project dimensions. Below is a summary of the results for two common small area scenarios using 20 kg bags of concrete mix. These figures assume a standard thickness and include a waste allowance where applicable.

Project DimensionsVolume (m³)Bags (20 kg)Ready-mix EquivalentCrushed Rock Base
1 m x 1 m x 100 mm0.1 m³12 bags0.2 m³0.12 t
2 m x 1 m x 100 mm0.2 m³24 bags0.4 m³0.24 t

Worked Example

To understand how the calculator arrives at these figures, let us walk through the first example. This example uses the 20 kg concrete mix bags and follows the standard calculation process.

First, we determine the area of the project. The dimensions are 1 metre in length and 1 metre in width, resulting in an area of 2 m². Next, we calculate the volume by multiplying the area by the thickness. With a thickness of 100 mm (0.1 metres), the volume is 0.2 m³. The calculation then includes a 5% allowance for wastage, as specified by the Cement Australia slab calculator page. This brings the total volume to 0.21 m³. Finally, we multiply the volume with waste by the bag yield. Using the 20 kg bag count, this results in 23.1 bags. Since you cannot buy a partial bag, you would round this up to purchase 24 bags.

Managing Waste and Base Materials

When calculating your materials, you must account for more than just the concrete bags. The Cement Australia slab calculator page notes that calculations should include a 5% allowance for wastage. This ensures that you have enough material to cover slight variations in the ground level or minor spills during the pouring process. Additionally, many projects require a prepared base before the concrete is poured. For a small project with a 1 m x 1 m area and a 100 mm thickness, the calculator suggests a crushed rock base of 0.12 t, assuming a 50 mm compacted depth. For a 2 m x 1 m area, the required base is 0.24 t. Always check your product label or supplier for the specific weight and type of base material required for your specific location and soil type.

New Zealand Considerations

In New Zealand, yields are listed per product. Dricon (Firth) HandiCrete lists 0.010 m³ for a 25 kg bag and 0.016 m³ for a 40 kg bag, so the bag count depends on the product you buy. Always use the yield printed on your own bag.

Common mistakes

One of the most frequent mistakes is using the wrong bag yield for the specific product being purchased. Because Post Mix and Concrete Mix have different yields, using a Post Mix figure to calculate a Concrete Mix requirement will result in an incorrect order. Another common error is failing to account for wastage. Without the 5% allowance mentioned by Cement Australia, you may find yourself short of material before the job is finished. Finally, many people forget to round up their final bag count. If the working figure ends in part of a bag, ordering the lower whole number leaves you short. Always round up to the next whole bag.

Frequently asked questions

Why do different brands have different bag counts?

Different manufacturers use different ratios of cement, sand, and aggregate, which changes the volume of finished concrete produced from a 20 kg bag.

Should I include waste in my calculation?

Yes, the Cement Australia slab calculator page suggests including a 5% allowance for wastage to ensure you have enough material.

What is the difference between Post Mix and Concrete Mix?

They are different products with different yields; for example, the Bunnings Post Mix yield is 0.01 m3 per 20 kg bag, while other brands may differ.

How many bags do I need for a 1 m2 area at 100 mm thick?

The calculator shows that you need 12 bags of 20 kg concrete mix.

Do I need to round up the number of bags?

Yes, you should always round up to the nearest whole bag to ensure you have sufficient material to complete the job.

Sources and assumptions

These are the settings behind every number above. Verified figures link to a source. Editable defaults are common rules of thumb: change them to match your product and your site.

Keep reading